|
General Operation I |
![]() |
![]() |
| Grid during operation | Grid during operation |
![]() |
![]() |
| IEC Staff | Running the equipment |
![]() |
![]() |
![]() |
| Constructing a stalk | High voltage set-up | Bob fixing the proton detector |
![]() |
|
| Murali on top of the chamber | Ross working on high voltage system |
![]() |
![]() |
| Greg building a stalk | IEC group debreif at the terrace |
| New IEC chamber | John with the new chamber |
![]() |
![]() |
| Dr. Hirsch and the IEC group | Dr. Hirsch and Dr. Kulcinski |
![]() |
![]() |
| Discussing the device | Explaining the grid design |