General Operation I |
Grid during operation | Grid during operation |
IEC Staff | Running the equipment |
Constructing a stalk | High voltage set-up | Bob fixing the proton detector |
Murali on top of the chamber | Ross working on high voltage system |
Greg building a stalk | IEC group debreif at the terrace |
New IEC chamber | John with the new chamber |
Dr. Hirsch and the IEC group | Dr. Hirsch and Dr. Kulcinski |
Discussing the device | Explaining the grid design |