General Operation I

 

Grid during operation Grid during operation
IEC Staff Running the equipment
Constructing a stalk High voltage set-up Bob fixing the proton detector
Murali on top of the chamber Ross working on high voltage system
Greg building a stalk IEC group debreif at the terrace
New IEC chamber John with the new chamber
Dr. Hirsch and the IEC group Dr. Hirsch and Dr. Kulcinski
Discussing the device Explaining the grid design